Building work has an awkward habit of measuring in one unit, specifying in a second, and buying in a third. You measure a driveway base in square feet, specify it in inches of depth, calculate it in cubic yards, and buy it by the ton. This is a reference for the conversions that come up most often, and for the ones where a single number cannot be given honestly.
Volume
These are fixed conversions, geometry rather than material properties, so they hold regardless of what you are measuring.
| From | To | Multiply by |
|---|---|---|
| Cubic yards | Cubic feet | 27 |
| Cubic feet | Cubic yards | 0.037 (÷ 27) |
| Cubic yards | Cubic meters | 0.765 |
| Cubic meters | Cubic yards | 1.308 |
| Cubic feet | Gallons (US) | 7.48 |
| Cubic yards | Gallons (US) | 202 |
| Cubic yards | Liters | 765 |
The one worth memorising is 27 cubic feet to the cubic yard, because it is buried inside almost every bulk material formula. The familiar shortcut for slabs and beds is length in feet times width in feet times depth in inches, divided by 324. That divisor is just 12 (inches to feet) times 27 (cubic feet to cubic yards) combined into one.
Area and coverage
| Situation | Conversion |
|---|---|
| Square feet to square yards | ÷ 9 |
| Square feet to squares (roofing) | ÷ 100 |
| 1 cubic yard spread 1 inch deep | 324 sq ft |
| 1 cubic yard spread 2 inches deep | 162 sq ft |
| 1 cubic yard spread 3 inches deep | 108 sq ft |
| 1 cubic yard spread 4 inches deep | 81 sq ft |
| 1 cubic yard spread 6 inches deep | 54 sq ft |
The coverage figures are the ones people actually need on site, and they all come from the same 324 divisor. A cubic yard covering 324 square feet at one inch means it covers half that at two inches, a third at three, and so on.
Weight: the conversions that need a material
This is where published conversion tables become misleading. There is no general cubic-yards-to-tons conversion. It depends entirely on what is in the yard.
| Material | Approx. Tons per Cubic Yard | Approx. Cubic Yards per Ton |
|---|---|---|
| Crushed stone / gravel | 1.4 | 0.71 |
| Sand | 1.3 | 0.77 |
| Topsoil (average moisture) | 1.1 | 0.91 |
| Screened dry topsoil | 1.0 | 1.00 |
| Wet topsoil | 1.2 | 0.83 |
| Wood mulch | 0.4–0.5 | 2.0–2.5 |
| Asphalt (compacted) | 1.9–2.0 | 0.50–0.53 |
A ton of mulch is roughly five times the volume of a ton of asphalt. Anyone who tells you “a cubic yard is about a ton and a half” is describing crushed stone and nothing else.
Moisture moves these figures more than most people expect. Topsoil after a wet week can be 20% heavier than the same soil dry, which is a real problem when you have ordered by weight and are expecting a volume. If you are buying by the ton to fill a space you measured by volume, order against the wetter figure and accept a small surplus. The gravel calculator and topsoil calculator both expose the density assumption so you can match it to what your supplier actually quotes.
Trade units that are not really units
Several figures in construction look like measurements but are conventions for ordering.
Roofing square. 100 square feet of roof surface. Three bundles of standard architectural shingles cover one square, though heavier or specialty products may run four or five bundles. The critical detail is that squares apply to the roof surface, not the building footprint. A 2,000 sq ft footprint under a 6/12 roof is about 2,236 sq ft of surface, which is 22.4 squares, not 20. Convert with the slope factor from the roof pitch calculator before ordering.
Board foot. 144 cubic inches of lumber: nominally 1 inch by 12 inches by 12 inches. Because it uses nominal dimensions, a 2x4 is calculated as 2 by 4 even though it actually measures 1.5 by 3.5 after dressing. Board feet are how rough and hardwood lumber is priced; dimensional framing lumber is usually sold by the piece instead. The board foot calculator works in nominal dimensions for this reason.
Square (siding). Also 100 square feet, same as roofing. Vinyl siding is typically boxed in two-square units.
Yard (concrete). Always a cubic yard, never a linear or square one. Ready-mix trucks carry 8 to 10 cubic yards, and most suppliers apply a short-load fee below about 3 or 4 yards, often enough to make a slightly larger order cheaper than a smaller one.
Bag counts
Bagged material is sold by volume or by weight depending on the product, which makes cross-comparison harder than it should be.
| Product | Bag Size | Bags per Cubic Yard |
|---|---|---|
| Topsoil / mulch | 0.75 cu ft | 36 |
| Topsoil / mulch | 1 cu ft | 27 |
| Topsoil / mulch | 1.5 cu ft | 18 |
| Topsoil / mulch | 2 cu ft | 14 |
| Concrete mix | 40 lb (0.30 cu ft) | 90 |
| Concrete mix | 50 lb (0.375 cu ft) | 72 |
| Concrete mix | 60 lb (0.45 cu ft) | 60 |
| Concrete mix | 80 lb (0.60 cu ft) | 45 |
Concrete bag yields are the ones worth checking against the bag itself, since they vary slightly between manufacturers and between standard and high-strength mixes. The concrete calculator uses the common yields above and lets you switch bag size to compare.
The crossover point between bagged and bulk is worth calculating rather than guessing. Forty-five 80 lb bags to a cubic yard means a modest 2-yard pour is 90 bags, around two tons of material to move by hand, and almost always more expensive than a short-load delivery once you price the labour.
Length and depth
| From | To | Multiply by |
|---|---|---|
| Inches | Feet | 0.0833 (÷ 12) |
| Feet | Inches | 12 |
| Feet | Meters | 0.3048 |
| Meters | Feet | 3.281 |
| Inches | Millimeters | 25.4 |
Depth is the most common place for a units error to cause a real problem, because depth is almost always specified in inches while length and width are in feet. Multiplying three numbers that are not in the same unit produces an answer that is wrong by a factor of 12, and a base that is one twelfth of the specified depth will fail in its first winter.
A note on rounding
Convert first, round last. Rounding at each intermediate step compounds the error, and on a large order the accumulated difference can be a meaningful fraction of a delivery.
The exception is the final number, which should be rounded up to whatever unit the supplier actually sells: whole bags, whole squares, whole pallets, or the supplier’s minimum increment for bulk. See our waste factors guide for why that final rounding matters more than the precision of the arithmetic that preceded it.
Last updated:
Written by: The CubedCalc Team. We research and fact-check every calculator using manufacturer specs, building codes, and industry references. We are not licensed contractors or engineers; always verify structural or code-critical numbers with a qualified professional.
Frequently Asked Questions
- How many cubic yards are in a ton of gravel?
- Roughly 0.7 cubic yards for typical crushed stone, which runs about 1.4 tons per cubic yard. There is no universal answer because the conversion depends entirely on density. A ton of topsoil is about 0.91 cubic yards, and a ton of dry mulch can exceed 2 cubic yards. Always convert using the density of the specific material.
- How many square feet are in a roofing square?
- 100 square feet. A roofing square is a trade unit used for ordering and pricing shingles, not a unit of area measurement. Three bundles of standard architectural shingles typically cover one square. Note that squares are measured on the roof surface, not the building footprint, so you must apply the roof's slope factor first.
- What is a board foot?
- A board foot is 144 cubic inches of lumber: nominally a piece 1 inch thick, 12 inches wide, and 12 inches long. It is a volume unit, so it is calculated from nominal dimensions rather than the actual dressed size of the board. A 2x4 that measures 1.5 by 3.5 inches is still priced as a nominal 2 by 4.
- Why do suppliers quote in tons when I measured in cubic yards?
- Bulk aggregate is weighed on a truck scale at the quarry, which is faster and more precise than measuring volume. You measure the hole in volume; they sell what the scale reads. The conversion between the two is the material's density, which varies with gradation and moisture. That is why a quarry ticket and your own estimate rarely match exactly.